Contactar

AAK solved the problem in 18 days for the hydraulic check valves

$ 30 /unidad
IVA no incluido
Cantidad mínima: 100 unidades
Tiempo de entrega: 3 meses
Envío a: Todo el mundo
Descripción de

AAK solved the problem in 18 days for the hydraulic check valves

:
Daniel is a purchaser of Liebherr branch in Germany. He is responsible for the procurement of hydraulic components. He has done an excellent job some time ago and has been praised by his supervisor for many times. Before the shopping season, he wanted to relax and planned to go on vacation with his family next week. A phone call from the boss disrupted all his plans. A major dealer in Sweden asked for help for a excavator produced by their company within 1 week . His engineer came to the user for routine maintenance and found that there was oil leakage in the hydraulic system. After pressure test, it was found that there was oil leakage in the hydraulic check valve, and 12 excavators had such faults.

Daniel hurriedly contacted the American supplier for this hydraulic check valve, and got the reply that it was too cold in Sweden at this time. For such high-frequency operation, even if the hydraulic check valve was replaced, it was estimated that the hydraulic check valve would still leak oil 1 week later. Unless more low temperature resistant sealing rings are used, this will take time to test, but the finishing time is to be determined. Daniel was so helpless, he had to find a new hydraulic valve supplier. Daniel asked several local hydraulic valve manufacturers. They either didn't have time to produce or require over 50pcs MOQ. After knowing these situations, the supervisor asked Daniel to give the dealer a plan that can be implemented within 10 days. Daniel had to cancel the vacation.

Daniel thought of AAK HYDRUALIC VALVE who he had contacted for inquiry before. He emailed us to ask whether we can produce the hydraulic check valve for the excavator, which needs to be resistant to low temperature. According to the drawings and working conditions provided by him, we advised that it takes 20 days to customize. All our existing hydraulic check valves are not close to this size. Daniel reiterated the hydraulic check valve needs to be low temperature resistant, and frankly told us what they are currently experiencing. I answered directly that the core lies in the low temperature resistant sealing ring. Daniel felt that maybe AAK could solve this problem.

After 18 days, we sent a sample of hydraulic check valve. The test results proved Daniel's feeling. The parameters passed the test and there was no oil leakage at low temperature. The order for 12 hydraulic check valves was also easily confirmed. Daniel's hanging heart can finally be put down.

Daniel asked why American hydraulic valve manufacturer needs time "to be determined" to test, and we solved it in 18 days. Why German hydraulic valve manufacturer is unwilling to do this small quantities, but it is OK for AAK hydraulic valve. At the same time, the price of AAK hydraulic valve is cheaper than that made in Germany and that made in the United States.

The zero leakage hydraulic valve not only has strict requirements on accuracy, but also strict requirements for the sealing ring due to different media or different scenarios. The sealing ring not only needs to be sealed, but also needs to automatically improve its sealing effect with the increase of the pressure of the hydraulic oil.
Aak hydraulic valve Digger Hydraulic Check Hydraulic valve manufacturer
ID producto: 11919509 | Referencia: AAK117 | Vendido por: AAK INDUSTRY CO., LTD
Fecha de alta del producto 23/12/2021 - Modificado por el vendedor 23/12/2021
Productos relacionados con

AAK solved the problem in 18 days for the hydraulic check valves