Contactar

AAK spent 6 months, 3 times material changes, 4 times testing to produce SP08-20

$ 30 /unidad
IVA no incluido
Cantidad mínima: 100 unidades
Tiempo de entrega: 3 meses
Envío a: Todo el mundo
Descripción de

AAK spent 6 months, 3 times material changes, 4 times testing to produce SP08-20

:
This week, we launched a new model equivalent to HydraForce SP08-20 SOLENOID PROPORTIONAL VALVE, NORMALLY CLOSED. At the beginning, we were also hesitant to develop, because currently none of a domestic hydraulic cartridge valve manufacturer in China can benchmark the standard of HydraForce SP08-20, especially the internal accuracy of the magnetic guide sleeve inside the valve, which is not only a high-end device that can solve. I know that as long as I promise to develop SP08-20 for customer, it will be accompanied by late night lights. As long as one detail is not in place, the characteristic curve cannot 100% benchmark HydraForce.

I told my engineer that when developing SP08-20, my mindset is: Don't ask about harvest, but ask about cultivation. Take the time to try, and leave the rest to luck. Fortunately, AAK spent 6 months, 3 times material changes, 4 times testing samples, and finally achieved the standard of HydraForce SP08-20 SOLENOID PROPORTIONAL VALVE successfully. The characteristic curve is 100% benchmarking HydraForce, and there is no second one in China now. This is God's favor for AAK.

AAK E-SP08-20 SOLENOID PROPORTIONAL VALVE, 2 main features:
1. Low leakage, internal leakage 5 drops/minute.
2. Performance benchmarking HydraForce, Ningbo has no second manufacturer

SPECIFICATIONS:
Max. Operating Pressure: 207 bar (3000 psi)
Flow: See PRESSURE DROP VS. FLOW graph
Internal Leakage: 5 drops/min max. at 207 bar (3000 psi)
Temperature: - 40 to 120 °C (with Standard Buna N seals)
Cavity: VC08-2
Aak hydraulic valves Solenoid Proportional
ID producto: 14179289 | Referencia: AAK543 | Vendido por: AAK INDUSTRY CO., LTD
Fecha de alta del producto 24/04/2023 - Modificado por el vendedor 24/04/2023
Productos relacionados con

AAK spent 6 months, 3 times material changes, 4 times testing to produce SP08-20